Atmospheric Wave Background
AICM • MANZANILLO • ASIA
MexWorld Logistics
MexWorld
+52 55 3137 7382 logistica@mexworld.mx
Safe transportation

TRUCK, SEA AND AIR

Customs agents, coloaders, shipping lines, import and export.

Infrastructure IN THE AICM - In the main ports
SERVICES

WHAT CAN WE DO FOR YOU?

SEA TRANSPORT

  • • With the main SHIPPING COMPANIES and COLOADER
  • – CONTAINERIZED SERVICE (FCL)
  • – CONSOLIDATED SERVICE (LCL)
★ Main negotiations Europe and Asia.

AIR TRANSPORTATION

We belong to a NETWORK at an international level that allows us to offer services and competitive costs for logistics in its different INCOTERMS both of IMPORT and EXPORT.

IATA • Worldwide Core

COURIER SERVICES

– NATIONAL: By the main Customs of Mexico (AICM-GDL-ZLO-VER-ATM)
– INTERNATIONAL: With internationally recognized CARRIER.
Express Customs Fast Track

ADDITIONAL

  • • MERCHANDISE INSURANCE
  • • STORAGE AND DISTRIBUTION
  • • PACKAGING and dangerous goods documentation.
End-To-End Protection
SUPPLIER COMPLIANCE

VERIFICATION OF COMPANIES

Physical audit prior to financial commitment.

SOS AUDIT

(Normative Audit)
STAGE 01

PRESENTIAL view in provider's facilities to document:

  • • Physical establishment of provider.
  • • Licenses, tax registration & ID validation.
  • • Commercial correlation matrix.
  • • Bank account confirmation VS authorities.
  • • Photographic proof of productive plant.
Direct Evidence Protocol Validation 100%

AUDIT FAD

(Technical Audit)
STAGE 02 FULL

PRESENTIAL view (Includes SOS AUDIT +):

01. FACILITIES Administrative plants.
02. MANUFACTURING Production lines.
03. ORGANIZATION Structure matrix.
04. STANDARDS Quality system.
Comprehensive Technical Rating ISO-Aligned
Inspections of

QUALITY CONTROL

8-Hour Technical Unit Formula

"The quality control inspections are calculated based on the 'day / man' unit comprising 8 working hours at inspection site. (Overtime applies after 8 hours.)"

PHASE 01

PPI – Pre Production

Check raw materials prior to start.

Progress: 0%
PHASE 02

FRI – First Pieces

Detect errors in early output.

< 20% Batch
PHASE 03

OPI – Production Line

Monitor intermediate batch work.

20% – 80%
PHASE 04

FPI – Finished Product

Final inspection before dispatch.

80% – 100%
STORAGE

WAREHOUSE

REC • CCTV 04 ACTIVE
Bodega Industrial de Carga MexWorld
ZONE: AICM A-01 SECURED

Parque Industrial AICM Logistics Core

1,167.98 FT² High-Security Staging

ALARM ADT

• Anti-theft direct police link.

CCTV Live

• Real-time visual recording.

Capacity

• 192 Total positions (156 racks).

ADDITIONAL

• Industrial park direct ramp.

REQUEST A QUOTE
CLS LOAD SUPERVISION (ASIA)

PREVIOUS IN ORIGIN

An inspector records the day of container loading technical and customs specifications, quantities, packing and sealing conditions.

Operation Performance Indicators AUDITED LIVE
CARGO INSPECTION 86%
PACKAGING GOODS FOR YEAR 64%
CUSTOMER INTERVENTION 59%
DELIVERY SATISFACTION 100%